Get a quote

How to prepare a BIM model for state expert review: a pre-submission checklist

Since 1 August 2026, designs of certain facilities in Kazakhstan are submitted for state expert review together with an information model. Here is what exactly is checked and how to avoid comments caused by technical details.

· ARQA Digital editorial team

What has to be submitted

For facilities on the list in Order No. 114, the design documentation is submitted together with an electronic model of the construction facility in IFC format and the client's information requirements (EIR, known locally as ITZ). This is set out in guidance published by RSE Gosexpertiza.

The same guidance names four checks to pass before submission: the IFC file opens and displays without errors, the model meets the client's requirements, the solutions in the model match the documentation, and the model is free of clashes. Below we break them down into practical steps.

Step 1. Make sure the requirement applies to your project

Whether it applies is determined by the facility type and the date of the design contract. You can check the facility type in the list with dates. In borderline cases, confirm the position with your local branch of the review body: it is quicker than receiving a comment after submission.

Step 2. Start with the EIR, not the model

The EIR is the document the model will be compared against. Until it exists, it is unclear which disciplines to model, which parameters to fill in and how detailed the geometry should be. The minimum content: the list of models by discipline, the level of development, the list of element parameters, IFC requirements, the coordinate system and naming rules. More in our article on EIR.

Step 3. Check the model itself

  1. All disciplines named in the EIR have been modelled.
  2. The discipline models share one coordinate system and match on grids and levels.
  3. Layouts, levels and sections correspond to the latest revision of the drawings.
  4. Elements are created in their own categories: a wall remains a wall, not a generic model.
  5. The parameters required by the EIR are filled in.
  6. There are no duplicate elements or objects left over from earlier options.
  7. Clash detection between disciplines has been run: critical clashes are resolved and the rest are justified.

Step 4. Check the IFC export

Most technical comments arise not in the model but during export. Default settings are almost never suitable.

  1. The mapping between model categories and IFC classes is configured.
  2. Custom parameters end up in property sets on export.
  3. The file has been opened in an independent viewer, not in the authoring software: the geometry is in place and the properties are readable.
  4. The model is split into files as the EIR requires.

Step 5. Cross-check the model against the documentation

The last, twelfth point: the sheets going to expert review were produced from the same version of the model or have been cross-checked against it. Check at least the floor plans, sections and key junctions of the building services.

A typical mistake. The model is built in the final week from drawings that have already been issued, while the drawings are still being revised. Discrepancies are inevitable in that set-up. It is safer to keep the model in step with the design, or to freeze the revision of the documentation it is built from.

What nobody knows for certain yet

Review practice under TIMSO is still taking shape, and the requirements for parameter sets and presentation are being refined. Before submission, check the current publications of RSE Gosexpertiza and the terms of your own EIR rather than someone else's template.

If time is short

The model can be prepared in parallel with the documentation. In one of our projects, models of all disciplines of a kindergarten were ready in two weeks. If the review date is close, we can bring in a team: we start with a rapid assessment of the drawings.

We will check your model before expert review

Send us the IFC or the drawings. Within one working day we will tell you what needs work before submission.

Frequently asked questions

Which software should the model for expert review be authored in?

The reviewers receive a file in the open IFC format, so the software can be any: Revit, ArchiCAD, Renga and others. What matters is that it exports IFC correctly and that the team knows how to configure the export.

Do all disciplines of the design have to be modelled?

The scope of models is defined by the EIR. If the document requires models of architecture, structures and building services, all of them must be provided. That is why the scope should be agreed with the client before work starts.

What is an independent IFC viewer?

A program for viewing IFC files that is not tied to the editor the model was authored in, for example BIMvision or Solibri Anywhere. Checking in it shows how another party, including the reviewer, will see the file.

Get a price and timeline

Describe the task or share a link to your drawings. Within one working day we will clarify the details and give you a price and a timeline. The initial assessment is free.

Offices
Almaty and London
Response
Within one working day

Your messenger will open with the request text ready. All you need to do is press Send.

WhatsAppGet a quote
Message us on WhatsApp