BIM for residential complexes and public buildings
From 1 January 2028 an information model is mandatory for residential and mixed-use buildings of 6 or more storeys and for public buildings of 3 or more storeys. For a developer it is useful today: to take off quantities accurately and avoid rework on site.
We reply within one working day. NDA signed before you share any drawings.
Order No. 114
What is mandatory and from when
- Residential and mixed-use buildings of 6 or more storeys
- From 1 January 2028, excluding the top technical floor.
- Administrative, amenity and public buildings of 3 or more storeys
- From 1 January 2028, excluding the top technical floor.
- Sports, entertainment and religious venues for 150 or more people
- From 1 January 2028.
- Railway stations, bus terminals, sea and river terminals
- From 1 January 2028.
Why developers need it
What a model gives you well before 2028
Quantities without manual counting
Concrete, reinforcement, masonry, windows, finishes: schedules by block and floor for tenders and control of contractors.
No surprises in car parks and plant floors
We check the zones most crowded with services in the federated model: headroom, crossings of main runs, penetrations through structures.
Areas from a single source
The unit mix and key indicators are calculated from the model and do not differ between disciplines.
Fewer changes in working documentation
We find mismatches between architecture, structures and services at design stage, when a fix takes hours.
Ready for 2028
By that date designers and contractors must know how to work with a model. It is best to rehearse the process on current projects.
A model for operation
An as-built model with equipment data will be useful to the facility manager.
Turnkey design
Concept, design stage and working documentation in an information model, with support through expert review. You receive documentation, the model and bills of quantities from a single source.
Working with your designer
We write the EIR, check the models delivered by the design firm, coordinate the disciplines and take off quantities for construction.
Planning a residential complex or a public building?
Tell us about the facility. We will suggest how to build BIM into the project without extending the timeline.
Frequently asked questions
Is a five-storey residential building covered?
From 1 January 2028 the Order names residential buildings of 6 or more storeys, and the top technical floor is not counted. As we read it, a five-storey building falls under the general stage from 1 January 2030, unless it belongs to the third level of responsibility.
We are a developer and an external firm does the design. What do we need to do?
Formulate the client's information requirements (EIR) and include them in the design contract. We can help write the EIR and will check the models the designer delivers.
Can quantities be taken off a finished 2D design?
Yes. We build a model from the drawings and produce bills of quantities by block and floor. Along the way we find mismatches between disciplines.
Related services
BIM design
Concept, design stage and working documentation in an information model. Drawings, schedules and the model from a single source.
Learn moreBIM coordination, 4D and 5D
Federated model, clash detection, quantities, a 4D programme and an as-built model for construction.
Learn moreBIM model for expert review
An electronic model in IFC and EIR to state review requirements. Clash checks, cross-check against drawings, support with reviewers' comments.
Learn moreGet a price and timeline
Describe the task or share a link to your drawings. Within one working day we will clarify the details and give you a price and a timeline. The initial assessment is free.
- +44 7933 998618
- Telegram
- @alexander_siv
- Offices
- Almaty and London
- Response
- Within one working day