Get a quote

BIM for residential complexes and public buildings

From 1 January 2028 an information model is mandatory for residential and mixed-use buildings of 6 or more storeys and for public buildings of 3 or more storeys. For a developer it is useful today: to take off quantities accurately and avoid rework on site.

We reply within one working day. NDA signed before you share any drawings.

Order No. 114

What is mandatory and from when

Residential and mixed-use buildings of 6 or more storeys
From 1 January 2028, excluding the top technical floor.
Administrative, amenity and public buildings of 3 or more storeys
From 1 January 2028, excluding the top technical floor.
Sports, entertainment and religious venues for 150 or more people
From 1 January 2028.
Railway stations, bus terminals, sea and river terminals
From 1 January 2028.

Why developers need it

What a model gives you well before 2028

Quantities without manual counting

Concrete, reinforcement, masonry, windows, finishes: schedules by block and floor for tenders and control of contractors.

No surprises in car parks and plant floors

We check the zones most crowded with services in the federated model: headroom, crossings of main runs, penetrations through structures.

Areas from a single source

The unit mix and key indicators are calculated from the model and do not differ between disciplines.

Fewer changes in working documentation

We find mismatches between architecture, structures and services at design stage, when a fix takes hours.

Ready for 2028

By that date designers and contractors must know how to work with a model. It is best to rehearse the process on current projects.

A model for operation

An as-built model with equipment data will be useful to the facility manager.

Turnkey design

Concept, design stage and working documentation in an information model, with support through expert review. You receive documentation, the model and bills of quantities from a single source.

BIM design

Working with your designer

We write the EIR, check the models delivered by the design firm, coordinate the disciplines and take off quantities for construction.

BIM coordination

Case study · Residential

BIM models of three residential high-rise buildings from working drawings

The client met all the requirements of the brief and completed the project.

Read the full case study

BIM models of three residential high-rise buildings from working drawings

Planning a residential complex or a public building?

Tell us about the facility. We will suggest how to build BIM into the project without extending the timeline.

Frequently asked questions

Is a five-storey residential building covered?

From 1 January 2028 the Order names residential buildings of 6 or more storeys, and the top technical floor is not counted. As we read it, a five-storey building falls under the general stage from 1 January 2030, unless it belongs to the third level of responsibility.

We are a developer and an external firm does the design. What do we need to do?

Formulate the client's information requirements (EIR) and include them in the design contract. We can help write the EIR and will check the models the designer delivers.

Can quantities be taken off a finished 2D design?

Yes. We build a model from the drawings and produce bills of quantities by block and floor. Along the way we find mismatches between disciplines.

Get a price and timeline

Describe the task or share a link to your drawings. Within one working day we will clarify the details and give you a price and a timeline. The initial assessment is free.

Offices
Almaty and London
Response
Within one working day

Your messenger will open with the request text ready. All you need to do is press Send.

WhatsAppGet a quote
Message us on WhatsApp