BIM model for state expert review in Kazakhstan
We prepare the electronic model of the construction facility in IFC and the client's information requirements (EIR, known locally as ITZ) the way Gosexpertiza, the state expert review body, expects them. We check the model before submission and support you through the reviewers' comments.
We reply within one working day. NDA signed before you share any drawings.
Why clients come to us
Three situations before expert review
The design is in 2D, but a model is required
The documentation is ready in AutoCAD, and the facility has fallen under the mandatory BIM list. We build models of all disciplines from your drawings and prepare the submission package.
There is a model, but it is not accepted
The reviewers have returned comments: the IFC opens with errors, the model differs from the drawings, parameters are missing. We find the causes and fix them.
The project is just starting
We write the EIR, agree modelling rules with your designers and keep the model in step with the design.
What the reviewers check
According to guidance from RSE Gosexpertiza, if mandatory TIMSO (the regulatory term for BIM in Kazakhstan) applies to a facility, the design is submitted together with an electronic model of the construction facility in IFC format and the client's information requirements. Four things need to be confirmed before submission:
- the IFC file opens and displays without errors;
- the model meets the client's requirements for the scope and content of the disciplines;
- the design solutions in the model match the documentation;
- the model is free of clashes.
Source: publication by RSE Gosexpertiza dated 20 August 2026 (in Russian).
What we do
- Write or refine the EIR
- Build models of architecture, structures, HVAC, plumbing, electrical and other disciplines from your documentation
- Assemble the federated model and resolve clashes
- Fill in element parameters as required by the EIR
- Configure the IFC export and check the file in an independent viewer
- Cross-check the model against the drawings sheet by sheet
- Prepare responses to the reviewers' comments and update the model
Deliverables
What you receive
- Discipline models
- RVT and IFC files for each discipline in a shared coordinate system.
- Federated model
- An NWD file for viewing and checking, and a combined IFC for submission.
- Check report
- A list of clashes found and resolved, and the results of the cross-check against the documentation.
- EIR
- The client's information requirements as a document ready to be submitted with the design.
- Support
- Responses to the reviewers' comments on the model and corrections within agreed time limits.
Process
From drawings to submission
- Rapid assessmentWe look at the drawings or the model and tell you within one working day what is missing for submission.
- EIR and model briefWe fix the scope of disciplines, element parameters and export rules.
- ModellingWe build or refine the models and flag inconsistencies in the documentation along the way.
- ChecksClashes, parameters, the IFC file, cross-check against the drawings.
- Submission and commentsWe hand over the package for upload to the portal and support the responses to comments.
Case studies
More projects for expert review
Expert reviewFederated BIM model of a wastewater treatment plant
Eight disciplines in one model, IFC export and support through expert review with no significant comments.Learn more
Expert reviewBIM model of a gas boiler house for expert review from 2D drawings
A model from 2D drawings, prepared for and taken through expert review. The client closed a government contract.Learn more
ResidentialBIM models of three residential high-rise buildings from working drawings
Three blocks, all disciplines. A model from DWG working documentation with views by discipline.Learn moreOrder No. 114
Facilities for which a model is already mandatory
From 1 August 2026
Already in force
- Schools, gymnasiums and lyceums for 600+ students
- Airports and passenger terminals
- Tunnels and metro systems
- Bridges 100 m or longer
- Unique facilities
From 1 January 2028
Next stage
- Residential and mixed-use buildings of 6+ storeys
- Public and administrative buildings of 3+ storeys
- Healthcare facilities, kindergartens with 95+ places
- Stations, sports and entertainment venues for 150+ people
- Energy, oil and gas, trunk utility networks
From 1 January 2030
All other facilities
- All types of construction facilities except those of the third level of responsibility
Expert review coming up?
Send us the drawings or the model. Within one working day we will tell you what needs work, what it costs and how long it takes.
Frequently asked questions
For which facilities is a BIM model mandatory?
The list was approved by Order No. 114 of the Minister of Industry and Construction of Kazakhstan. From 1 August 2026 it covers schools for 600 or more students, airports, tunnels, metro systems, bridges 100 m or longer and unique facilities. From 1 January 2028 it adds residential buildings of 6 or more storeys, public buildings of 3 or more storeys, healthcare facilities and others. Full list and facility check.
In what format is the model submitted?
In the open IFC format. So it matters less which software the model was authored in: Revit, ArchiCAD or another BIM platform. What matters is that the export is configured correctly and the file opens without errors and carries the required parameters.
What are the EIR and who writes them?
The client's information requirements describe what the model must be: the scope of disciplines, the level of development, element parameters and formats. The document comes from the client, but in practice it is often drafted by the designer or a BIM contractor. More in our article on EIR.
The reviewers returned comments on our model. Will you take it on?
Yes. We start with an audit: we open the IFC, compare the model with the documentation and the reviewer's comments, and draw up a list of fixes with a timeline. In one of our projects we prepared models of all disciplines of a kindergarten in two weeks, and the design passed expert review.
How long does it take to prepare a model?
It depends on the floor area, the number of disciplines and the quality of the drawings. As a guide: we issued models of all disciplines of a kindergarten at design stage in two weeks. We will give you an exact timeline once we have seen the input data.
Can we hand over only the building services disciplines?
Yes. Design firms often model architecture and structures in-house and pass HVAC, plumbing and electrical to us. We assemble the federated model and check how the disciplines fit together.
Related services
BIM modelling from drawings
An information 3D model of a building from DWG and PDF drawings. All disciplines, the level of development you need.
Learn moreBIM coordination, 4D and 5D
Federated model, clash detection, quantities, a 4D programme and an as-built model for construction.
Learn moreBIM implementation
Audit, BIM standard, templates to Kazakhstan's codes, a pilot project and support through the first expert review.
Learn moreGet a price and timeline
Describe the task or share a link to your drawings. Within one working day we will clarify the details and give you a price and a timeline. The initial assessment is free.
- +44 7933 998618
- Telegram
- @alexander_siv
- Offices
- Almaty and London
- Response
- Within one working day
