Get a quote

EIR in Kazakhstan: what the client's information requirements are and how to write them

The EIR, known locally as ITZ, go to state expert review together with the model, and it is against them that the model will be compared. Here is what the document should contain and how to avoid writing too much.

· ARQA Digital editorial team

What the EIR are

The client's information requirements are a document in which the client describes the information model they want to receive: what it consists of, how detailed it is, what data its elements carry and in what form it is handed over. In Russian the document is called ИТЗ (ITZ). It corresponds to the Exchange Information Requirements (EIR) of ISO 19650.

Why they are needed

  • The designer understands the scope of work before signing the contract and can price it honestly.
  • The client accepts the model against clear criteria rather than by eye.
  • The reviewers compare the model with the requirements: compliance with the EIR is listed among the pre-submission checks in the guidance published by RSE Gosexpertiza.

Who writes the EIR

Formally the document comes from the client. In practice the client rarely has a BIM specialist, so the text is drafted by the design firm or a BIM contractor and approved by the client. That is fine as long as the requirements remain verifiable rather than tailored to what suits the supplier.

What to include in the document

SectionWhat to describe
Purposes of the modelExpert review, coordination, quantity take-off, construction, operation. Everything else follows from the purposes.
Model scopeWhich disciplines are modelled and how they are split into files.
Level of developmentThe required detail of geometry and data for each stage and discipline.
Element parametersThe list of properties that must be filled in and the rules for naming them.
Formats and versionsIFC for handover, native formats, software versions.
Coordinates and unitsBase point, grids, levels, units of measurement.
NamingRules for naming files, views, families and systems.
Quality checksWhich checks are run before handover: clashes, parameters, export.
Handover procedureDeadlines, contents of the package, common data environment, responsible persons.

Five common mistakes

  1. Copying someone else's template wholesale. Requirements that nobody will check only make the model more expensive.
  2. Demanding maximum detail everywhere. Expert review at design stage does not need fabrication-level detail.
  3. Not listing the parameters. The phrase “the model shall contain attributes” means nothing without a list.
  4. Forgetting about IFC. Export settings must be agreed before modelling starts, not on the day of submission.
  5. Writing the EIR after the model. Then the document is fitted to the result, and discrepancies are found anyway.

EIR and the execution plan

In response to the EIR the supplier prepares a BIM Execution Plan (BEP): who keeps the model, in which software and to what schedule. SP RK 1.02-111-2017 describes the project execution plan and provides templates for the task and master information delivery plans (TIDP and MIDP).

Before drafting the document, check the current requirements and guidance on the RSE Gosexpertiza website: practice under TIMSO is evolving quickly.

Need an EIR for your facility?

We write the document for the facility type and stage, agree it with your designer and check that the model complies with it. How we prepare models for expert review.

Frequently asked questions

Are ITZ and EIR the same thing?

In substance, yes. EIR (Exchange Information Requirements) in ISO 19650 describes the client's requirements for information. In Kazakhstan the term ITZ (ИТЗ) is used.

Can the EIR be taken from another facility?

As a basis, yes. But the purposes, the scope of disciplines and the parameters must be reviewed for the specific facility, otherwise you either overpay for what you do not need or do not get what you do.

How long should the document be?

Long enough for the model to be accepted against it. Usually that is a few pages of text plus tables of parameters by element category.

Get a price and timeline

Describe the task or share a link to your drawings. Within one working day we will clarify the details and give you a price and a timeline. The initial assessment is free.

Offices
Almaty and London
Response
Within one working day

Your messenger will open with the request text ready. All you need to do is press Send.

WhatsAppGet a quote
Message us on WhatsApp