BIM for industrial facilities: plants, energy, oil and gas
We model production buildings, process lines and utility infrastructure. For energy and oil and gas facilities an information model is mandatory from 1 January 2028.
We reply within one working day. NDA signed before you share any drawings.
What we model
From the frame of the building to the last pipe
Production buildings
Frame, equipment foundations, crane-supporting and envelope structures.
Process lines
Equipment, pipework, pipe racks, service platforms: to the process engineers' brief and vendor data.
Building services
Ventilation and dust extraction, water supply, power supply, controls, cleanrooms.
Order No. 114
What is mandatory and from when
- Oil and gas facilities
- From 1 January 2028: production, field gathering, treatment, transportation, processing and storage of oil and gas, and liquefied natural gas facilities.
- Power plants of all types
- From 1 January 2028: thermal, hydroelectric, solar, wind and other generation facilities.
- Power supply facilities
- From 1 January 2028: substations, switchgear, power lines, power supply centres.
- Thermal power buildings and structures of 150 MW or more
- From 1 January 2028.
- Other production facilities
- From 1 January 2030, except facilities of the third level of responsibility.
Why a plant needs a model
On an operating plant the cost of an error is measured in line downtime. A model lets you check the installation of new equipment, pipe routing and the logistics of the works before going to site.
For refurbishment we build a model of the existing building from measured surveys, archive drawings or a point cloud.
Team experience
- BIM models of two pharmaceutical plants in Kazakhstan
- BIM contractor at a mining and processing plant
- Industrial and civil projects in the CIS and Europe
Case study · Industrial · Kazakhstan
BIM modelling of two pharmaceutical plants in Kazakhstan
The models were handed over to the client. Project details are covered by a non-disclosure agreement: we will gladly walk you through our approach in a meeting.
Building or refurbishing a production facility?
Send us the drawings or describe the facility. We will assess the model within one working day.
Frequently asked questions
Can you build a model of an operating plant building?
Yes. We work from archive drawings, measured surveys and laser-scan point clouds. The accuracy and scope of the model are set by the purpose: refurbishment, placement of new equipment or operation.
In what form do you accept equipment data?
Vendor models and drawings in common formats: DWG, RVT, IFC or PDF with overall dimensions. If there is no model, we create a family from the product data sheet.
Do you work under NDA?
Yes. We sign a non-disclosure agreement before any input data is shared and do not publish the names of facilities.
Related services
BIM modelling from drawings
An information 3D model of a building from DWG and PDF drawings. All disciplines, the level of development you need.
Learn moreBIM coordination, 4D and 5D
Federated model, clash detection, quantities, a 4D programme and an as-built model for construction.
Learn morePlugins and automation
Plugins for Revit, AutoCAD and Navisworks: schedules based on the AGSK catalogue, annotation, model checks.
Learn moreGet a price and timeline
Describe the task or share a link to your drawings. Within one working day we will clarify the details and give you a price and a timeline. The initial assessment is free.
- +44 7933 998618
- Telegram
- @alexander_siv
- Offices
- Almaty and London
- Response
- Within one working day
