BIM for industrial facilities: plants, energy, oil and gas

We model production buildings, process lines and utility infrastructure. For energy and oil and gas facilities an information model is mandatory from 1 January 2028.

We reply within one working day. NDA signed before you share any drawings.

What we model

From the frame of the building to the last pipe

Production buildings

Frame, equipment foundations, crane-supporting and envelope structures.

Process lines

Equipment, pipework, pipe racks, service platforms: to the process engineers' brief and vendor data.

Building services

Ventilation and dust extraction, water supply, power supply, controls, cleanrooms.

Order No. 114

What is mandatory and from when

Oil and gas facilities
From 1 January 2028: production, field gathering, treatment, transportation, processing and storage of oil and gas, and liquefied natural gas facilities.
Power plants of all types
From 1 January 2028: thermal, hydroelectric, solar, wind and other generation facilities.
Power supply facilities
From 1 January 2028: substations, switchgear, power lines, power supply centres.
Thermal power buildings and structures of 150 MW or more
From 1 January 2028.
Other production facilities
From 1 January 2030, except facilities of the third level of responsibility.

Why a plant needs a model

On an operating plant the cost of an error is measured in line downtime. A model lets you check the installation of new equipment, pipe routing and the logistics of the works before going to site.

For refurbishment we build a model of the existing building from measured surveys, archive drawings or a point cloud.

Team experience

  • BIM models of two pharmaceutical plants in Kazakhstan
  • BIM contractor at a mining and processing plant
  • Industrial and civil projects in the CIS and Europe

View case studies

Case study · Industrial

BIM model of a laboratory at a gas field in the Far North

Clashes were eliminated before installation started, and the material schedules were accurate.

Read the full case study

BIM model of a laboratory at a gas field in the Far North

Case study · Industrial · Kazakhstan

BIM modelling of two pharmaceutical plants in Kazakhstan

The models were handed over to the client. Project details are covered by a non-disclosure agreement: we will gladly walk you through our approach in a meeting.

Read the full case study

Building or refurbishing a production facility?

Send us the drawings or describe the facility. We will assess the model within one working day.

Frequently asked questions

Can you build a model of an operating plant building?

Yes. We work from archive drawings, measured surveys and laser-scan point clouds. The accuracy and scope of the model are set by the purpose: refurbishment, placement of new equipment or operation.

In what form do you accept equipment data?

Vendor models and drawings in common formats: DWG, RVT, IFC or PDF with overall dimensions. If there is no model, we create a family from the product data sheet.

Do you work under NDA?

Yes. We sign a non-disclosure agreement before any input data is shared and do not publish the names of facilities.

Get a price and timeline

Describe the task or share a link to your drawings. Within one working day we will clarify the details and give you a price and a timeline. The initial assessment is free.

Offices
Almaty and London
Response
Within one working day

Your messenger will open with the request text ready. All you need to do is press Send.

WhatsAppGet a quote
Message us on WhatsApp