BIM model of a laboratory at a gas field in the Far North
Clashes removed before installation, accurate schedules. Materials reach the site by helicopter.
We reply within one working day. NDA signed before you share any drawings.

- Challenge
For a laboratory at a gas field in the Far North, installation errors had to be ruled out: materials are delivered to site by helicopter, so any shortfall or rework is extremely expensive.
- What we did
- Built the model from the 2D working drawings
- Found and resolved clashes between building services and structures
- Produced schedules from the model
- Result
Clashes were eliminated before installation started, and the material schedules were accurate.
More case studies
Expert reviewBIM models of a kindergarten for expert review in two weeks
Models of all design-stage disciplines in two weeks. IFC export fixed, the design passed expert review.Learn more
Expert reviewFederated BIM model of a wastewater treatment plant
Eight disciplines in one model, IFC export and support through expert review with no significant comments.Learn more
Expert reviewBIM model of a gas boiler house for expert review from 2D drawings
A model from 2D drawings, prepared for and taken through expert review. The client closed a government contract.Learn moreRelated services
Get a price and timeline
Describe the task or share a link to your drawings. Within one working day we will clarify the details and give you a price and a timeline. The initial assessment is free.
- +44 7933 998618
- Telegram
- @alexander_siv
- Offices
- Almaty and London
- Response
- Within one working day