Get a quote

BIM model of a laboratory at a gas field in the Far North

Clashes removed before installation, accurate schedules. Materials reach the site by helicopter.

We reply within one working day. NDA signed before you share any drawings.

BIM model of a laboratory at a gas field in the Far North
Model excerpt. Image anonymised.
Challenge

For a laboratory at a gas field in the Far North, installation errors had to be ruled out: materials are delivered to site by helicopter, so any shortfall or rework is extremely expensive.

What we did
  • Built the model from the 2D working drawings
  • Found and resolved clashes between building services and structures
  • Produced schedules from the model
Result

Clashes were eliminated before installation started, and the material schedules were accurate.

Get a price and timeline

Describe the task or share a link to your drawings. Within one working day we will clarify the details and give you a price and a timeline. The initial assessment is free.

Offices
Almaty and London
Response
Within one working day

Your messenger will open with the request text ready. All you need to do is press Send.

WhatsAppGet a quote
Message us on WhatsApp