BIM coordination and clash detection

We bring the models of all disciplines into a federated model, find clashes before construction and see them through to resolution. For general contractors we provide quantities from the model, a 4D programme and an as-built model.

We reply within one working day. NDA signed before you share any drawings.

An error costs minutes in the model and days on site

Most rework on site originates where disciplines meet: a duct hits a beam, a riser passes through a girder, a tray takes the place of a pipe. In a federated model these spots are visible before the concrete is poured.

We take on the role of BIM coordinator: we collect the models, check them, keep the issue register and make sure the designers close the issues.

What is included

  • A federated model built from all parties' files
  • Automated and visual clash detection
  • A report: view, sheet, location, description and proposed solution
  • Coordination meetings with the designers
  • Tracking of issues until they are closed
  • Checking the models against the EIR

For general contractors and clients

What the model does for you on site

Quantities from the model (5D)

Schedules of concrete, reinforcement, masonry, finishes and building services by zone and floor. A basis for estimates, procurement and control of subcontractors.

The programme in the model (4D)

We link model elements to the construction programme and show the construction sequence. Useful for planning and for reporting to the investor.

As-built model

We record actual changes from the site in the model. The result is an as-built model for handover and operation.

BIM control of designers

We check the models your consultants hand over: compliance with the EIR, clashes, completeness of parameters.

Coordination of a 2D project

No models? We build them from DWG and PDF drawings and run coordination just as for a BIM project.

A BIM manager for the project

We write the BIM Execution Plan (BEP) and set up the common data environment and exchange rules between the parties.

Coordination cycle

How one iteration works

  1. Collecting the modelsWe receive the current discipline files and assemble the federated model.
  2. CheckingWe run checks against the clash matrix and review the model visually.
  3. ReportWe group the clashes, discard false positives and describe each issue.
  4. MeetingWe go through the issues with the designers and assign owners.
  5. Follow-upIn the next iteration we check that issues are closed and no new ones have appeared.

Case study · Coordination

Car park clash resolution: savings of 4 million roubles for the contractor

Through optimised timelines, materials and less rework, the client saved about 4 million roubles.

Read the full case study

Car park clash resolution: savings of 4 million roubles for the contractor

We will check your project for clashes

Send us the models or drawings of the disciplines. We will tell you how long the first check takes and what the report will contain.

Frequently asked questions

What is a clash?

An intersection or conflict between model elements: a pipe runs through a beam, equipment does not fit its allocated zone, a required clearance is not maintained. There are hard clashes and clearance violations.

Can a project be checked if it was produced in 2D?

Yes. We build discipline models from DWG and PDF drawings and check them just like a BIM project. That is how we worked in our case study on coordination from 2D documentation.

How often are checks carried out?

During active design, usually every one to two weeks and before each issue of documentation. The schedule is fixed before work starts.

What are 4D and 5D?

4D is a model linked to the construction programme. 5D is a model that yields quantities and cost. Both work only if the model is built to consistent rules, so it is best to start with a modelling brief.

We are a general contractor and the model was produced by the designer. Where do we start?

With a model audit. We check whether it can be used for quantity take-off and construction and tell you what needs work.

Get a price and timeline

Describe the task or share a link to your drawings. Within one working day we will clarify the details and give you a price and a timeline. The initial assessment is free.

Offices
Almaty and London
Response
Within one working day

Your messenger will open with the request text ready. All you need to do is press Send.

WhatsAppGet a quote
Message us on WhatsApp