Car park clash resolution: savings of 4 million roubles for the contractor
A model from 2D drawings and clash resolution before installation. Savings of about 4 million roubles.
We reply within one working day. NDA signed before you share any drawings.

- Challenge
An installation contractor received the working documentation of a car park in 2D and wanted to be sure, before going to site, that the building services did not conflict with the structures or with each other.
- What we did
- Built the model from the 2D working drawings, from structures to building services
- Found the clashes: ducts against beams, pipes against cable trays, penetrations through structures
- For each issue prepared a view showing the conflict, the sheet, the location, a description and a proposed solution
- Checked that no new clashes appeared after the fixes
- Result
Through optimised timelines, materials and less rework, the client saved about 4 million roubles.
More case studies
Expert reviewBIM models of a kindergarten for expert review in two weeks
Models of all design-stage disciplines in two weeks. IFC export fixed, the design passed expert review.Learn more
Expert reviewFederated BIM model of a wastewater treatment plant
Eight disciplines in one model, IFC export and support through expert review with no significant comments.Learn more
Expert reviewBIM model of a gas boiler house for expert review from 2D drawings
A model from 2D drawings, prepared for and taken through expert review. The client closed a government contract.Learn moreRelated services
Get a price and timeline
Describe the task or share a link to your drawings. Within one working day we will clarify the details and give you a price and a timeline. The initial assessment is free.
- +44 7933 998618
- Telegram
- @alexander_siv
- Offices
- Almaty and London
- Response
- Within one working day