Get a quote

Car park clash resolution: savings of 4 million roubles for the contractor

A model from 2D drawings and clash resolution before installation. Savings of about 4 million roubles.

We reply within one working day. NDA signed before you share any drawings.

Car park clash resolution: savings of 4 million roubles for the contractor
Model excerpt. Image anonymised.
Challenge

An installation contractor received the working documentation of a car park in 2D and wanted to be sure, before going to site, that the building services did not conflict with the structures or with each other.

What we did
  • Built the model from the 2D working drawings, from structures to building services
  • Found the clashes: ducts against beams, pipes against cable trays, penetrations through structures
  • For each issue prepared a view showing the conflict, the sheet, the location, a description and a proposed solution
  • Checked that no new clashes appeared after the fixes
Result

Through optimised timelines, materials and less rework, the client saved about 4 million roubles.

Get a price and timeline

Describe the task or share a link to your drawings. Within one working day we will clarify the details and give you a price and a timeline. The initial assessment is free.

Offices
Almaty and London
Response
Within one working day

Your messenger will open with the request text ready. All you need to do is press Send.

WhatsAppGet a quote
Message us on WhatsApp