Get a quote

BIM models of schools and kindergartens for state expert review

For schools with a capacity of 600 or more students an information model has been mandatory since 1 August 2026, and for kindergartens with 95 or more places it becomes mandatory on 1 January 2028. We prepare models of all disciplines, the EIR and the IFC package.

We reply within one working day. NDA signed before you share any drawings.

Order No. 114

What is mandatory and from when

Schools, gymnasiums and lyceums for 600 or more students
From 1 August 2026. The requirement is already in force.
Kindergartens with 95 or more places
From 1 January 2028.
Dormitory buildings of boarding schools and children's camps for more than 100 children
From 1 January 2028.
University and college campuses
From 1 January 2028, except stand-alone sports complexes, catering blocks, residential compounds and dormitories.

Where things usually go wrong

A school looks like a standard facility, but it is dense with systems: a kitchen block, sports and assembly halls, large-section ventilation, escape routes. In our experience, comments on the model usually come down to three things:

  • the model differs from the drawings: layouts changed and the model was not updated;
  • the IFC was exported with default settings, so some parameters and element classes were lost;
  • building services clash with structures in corridors and the technical basement.

What we do

  • Write the EIR for a school or kindergarten
  • Model architecture, structures, HVAC, plumbing, electrical and low-voltage systems
  • Federate the disciplines and resolve clashes
  • Check the IFC and cross-check the model against the documentation
  • Support the responses to reviewers' comments

More about the service

Case study · Expert review

BIM models of a kindergarten for expert review in two weeks

Models of all disciplines were ready in two weeks. The design passed state expert review, and the model is being used at the next stages.

Read the full case study

BIM models of a kindergarten for expert review in two weeks

Is a school design already under way?

Send us the drawings or the model. Within one working day we will tell you what is missing for submission to expert review.

Frequently asked questions

Our design contract for a school was signed before 1 August 2026. Is a model required?

Whether the requirement applies is determined by the facility type and the date of the design contract. If in doubt, confirm the position with the local branch of the review body before submission. We can help you word the question and, if needed, prepare the model.

Is a school for 300 students covered?

From 1 August 2026, Order No. 114 names schools with a capacity of 600 or more students. As we read it, a smaller building falls under the later stages: from 1 January 2028 as a public building of 3 or more storeys, or from 1 January 2030 along with all facilities except those of the third level of responsibility.

How long does a model of a school take?

In our case study, models of all design-stage disciplines of a kindergarten were ready in two weeks. We will give a timeline for your facility after seeing the drawings.

Get a price and timeline

Describe the task or share a link to your drawings. Within one working day we will clarify the details and give you a price and a timeline. The initial assessment is free.

Offices
Almaty and London
Response
Within one working day

Your messenger will open with the request text ready. All you need to do is press Send.

WhatsAppGet a quote
Message us on WhatsApp