Get a quote

BIM for hospitals, clinics and other healthcare facilities

From 1 January 2028 an information model is mandatory for healthcare facilities and medical institutions. In medical buildings BIM pays back sooner: too many systems meet in one ceiling void.

We reply within one working day. NDA signed before you share any drawings.

Why healthcare facilities are harder

In a hospital ceiling void, supply and extract ventilation, medical gases, water supply, drainage, power, low-voltage networks and controls all meet. Add equipment with strict requirements for placement and connections.

In 2D such junctions are almost impossible to check. In a model every clash and every maintenance clearance is visible.

What we do

  • Models of architecture, structures and all building services
  • Placement of medical equipment to the medical planners' brief
  • Coordination of services in corridors, operating blocks and plant floors
  • Checking maintenance zones around equipment
  • EIR, IFC export and preparation for expert review
  • Schedules and bills of quantities from the model

Order No. 114

Healthcare falls under stage two

From 1 August 2026

Already in force

  • Schools, gymnasiums and lyceums for 600+ students
  • Airports and passenger terminals
  • Tunnels and metro systems
  • Bridges 100 m or longer
  • Unique facilities

From 1 January 2028

Next stage

  • Residential and mixed-use buildings of 6+ storeys
  • Public and administrative buildings of 3+ storeys
  • Healthcare facilities, kindergartens with 95+ places
  • Stations, sports and entertainment venues for 150+ people
  • Energy, oil and gas, trunk utility networks

From 1 January 2030

All other facilities

  • All types of construction facilities except those of the third level of responsibility

Full list of facility types

Case study · Industrial · Kazakhstan

BIM modelling of two pharmaceutical plants in Kazakhstan

The models were handed over to the client. Project details are covered by a non-disclosure agreement: we will gladly walk you through our approach in a meeting.

Read the full case study

Designing a healthcare facility?

We can join at any stage: from the EIR and a model for expert review to coordination of working documentation.

Frequently asked questions

From what date is BIM mandatory for hospitals?

From 1 January 2028. Order No. 114 names healthcare facilities and medical and preventive care institutions with no limits on floor area or number of storeys.

Do you develop the medical planning?

Medical planning is developed by specialist planners. We place the equipment in the model to their brief and check connections, access routes and maintenance zones.

Can you join a project that is already under way?

Yes. We start with an audit of what exists: drawings or models. Then we suggest which disciplines to model first in order to be ready for expert review.

Get a price and timeline

Describe the task or share a link to your drawings. Within one working day we will clarify the details and give you a price and a timeline. The initial assessment is free.

Offices
Almaty and London
Response
Within one working day

Your messenger will open with the request text ready. All you need to do is press Send.

WhatsAppGet a quote
Message us on WhatsApp