How much does BIM modelling cost: what the price depends on

Two proposals for the same model can differ several times over. Here is what the cost is made of, how to compare contractors and where to save without losing quality.

· ARQA Digital editorial team

Six price factors

1. Floor area and facility type

A residential building with repeating floors is quicker to model than a hospital or a plant of the same area. The more unique rooms and systems, the higher the effort.

2. Number of disciplines

Architecture and structures are one level of effort. A full set with heating, ventilation, water supply, electrical and low-voltage networks is another. Building services are usually the most labour-intensive.

3. Level of development

A model for expert review at design stage and a model for installation differ several times in the amount of work. The level should be set for each discipline separately: see the LOD table with examples.

4. Quality of input data

Up-to-date DWG files with grids and layers, or scans with handwritten notes. In the second case part of the time goes on questions and resolving contradictions.

5. Data requirements

How many parameters must be filled in for each element and where they come from. Ten parameters from drawings and fifty from equipment data sheets are different jobs.

6. Deadlines

An urgent model needs a larger team and tight coordination, so it costs more.

What a proposal should contain

  • The list of disciplines and the level of development of each.
  • Delivery formats: RVT, IFC, NWD, drawings.
  • Whether clash detection is included and in what form the report comes.
  • The number of revision rounds.
  • Support with reviewers' comments.
  • The deadline and the schedule of interim deliveries.

How to compare contractors

Compare the scope of work rather than the price per square metre. A cheap proposal often leaves out clash detection, the cross-check against the drawings and IFC set-up: exactly the things that later get a model returned. Ask for a sample check report and ask who will respond to comments.

Where you can save

  • Do not over-specify the level of development where it is not needed.
  • Hand over up-to-date drawings as one set rather than in pieces.
  • Model only the disciplines the EIR requires.
  • Appoint one person to answer the modellers' questions.

Where not to save

  • Clash detection.
  • Cross-checking the model against the documentation.
  • Setting up and checking the IFC export.

Why we do not publish a price list

An honest price appears once the drawings have been seen: otherwise it is either an inflated range or a figure that grows later. We name the price within one working day and fix it in the contract.

Find out what a model of your facility costs

Send us the drawings or the brief. We will name the price and timeline within one working day.

Frequently asked questions

Is there a price per square metre?

A per-square-metre guide can only be given for standard buildings with a known scope of disciplines. An exact figure needs the drawings: they show how complex the facility really is.

Is BIM design more expensive than conventional design?

Designing in a model takes more effort at the early stages but reduces rework in working documentation and on site. For facilities on the mandatory BIM list the question does not arise: the model will be needed anyway.

Can the work be paid for in stages?

Yes. Payment stages are tied to interim deliveries and fixed in the contract.

Get a price and timeline

Describe the task or share a link to your drawings. Within one working day we will clarify the details and give you a price and a timeline. The initial assessment is free.

Offices
Almaty and London
Response
Within one working day

Your messenger will open with the request text ready. All you need to do is press Send.

WhatsAppGet a quote
Message us on WhatsApp