BIM in construction: what a BIM model and BIM design are
An explanation without jargon for its own sake: what BIM is, how a model differs from a three-dimensional picture and whose money it saves on a project.
What is BIM
BIM stands for Building Information Modeling. Instead of a set of unconnected drawings, a digital model is created in which every element knows its dimensions, material, type and place in a system. A wall, a beam, a duct, a distribution board: all of these are objects with data, not lines.
What is a BIM model
A BIM model is a digital copy of the facility from which plans, sections, schedules and quantities can be produced. A change is made once: move a wall and all views, schedules and areas update.
How a BIM model differs from a 3D model
| 3D model | BIM model | |
|---|---|---|
| What it contains | Geometry and materials for an image | Geometry and data about every element |
| What it is for | Visualisation, presentation | Drawings, schedules, clash detection, quantities, expert review |
| What happens on a change | Redrawn by hand | All linked views and schedules update |
| Who uses it | The architect and marketing | Every project party, from the client to the operator |
What is BIM design
It is design in which documentation is not drawn separately but produced from the model. The architect, the structural engineer and the services engineers work in linked models and see each other's decisions. Mismatches are found by software before work starts on site. How BIM design works with us.
What BIM gives the project parties
The client
Clear quantities and budget before construction starts, fewer variations, a model for operating the building.
The designer
Fewer errors where disciplines meet, fast changes, schedules without manual counting. And the ability to deliver facilities for which a model is mandatory.
The contractor
Accurate bills of materials, a clear sequence of work, less rework caused by clashes between services and structures.
What 3D, 4D and 5D mean
- 3D: geometry and data about the elements.
- 4D: a model linked to the construction programme.
- 5D: a model that yields quantities and cost.
BIM in road and infrastructure construction
The same principles apply to linear facilities: roads, bridges, networks. Kazakhstan's mandatory BIM list already includes tunnels and bridges 100 m or longer, and from 2028 it covers category I and II motor roads and trunk railways.
Where to start
Check whether BIM is mandatory for your facilities. If it is, start with one pilot project: a contractor can deliver it while your own team is trained in parallel. If it is not, start with the task where a model pays back fastest: clash detection or quantity take-off.
Frequently asked questions
Is BIM a software product?
No. BIM is an approach to design and construction. Products such as Revit, ArchiCAD or Renga are the tools in which a model is created.
Are BIM and TIMSO the same thing in Kazakhstan?
Yes. TIMSO (information modelling technology for construction facilities) is the name for BIM in Kazakhstan's regulations. More about the term.
Can a finished 2D design be moved to BIM?
Yes. An information model is built from DWG and PDF drawings: for expert review, coordination or quantity take-off.
Related services
BIM design
Concept, design stage and working documentation in an information model. Drawings, schedules and the model from a single source.
Learn moreBIM modelling from drawings
An information 3D model of a building from DWG and PDF drawings. All disciplines, the level of development you need.
Learn moreBIM implementation
Audit, BIM standard, templates to Kazakhstan's codes, a pilot project and support through the first expert review.
Learn moreGet a price and timeline
Describe the task or share a link to your drawings. Within one working day we will clarify the details and give you a price and a timeline. The initial assessment is free.
- +44 7933 998618
- Telegram
- @alexander_siv
- Offices
- Almaty and London
- Response
- Within one working day